CFI's Driven Pile Academy: Hosted by the PDCA
WHERE ARE THE PROBLEMS? • Owner wants to use 100 ft long, 18- inch square concrete piles • Drilled on August 22 • Initial Water Level = 8.0 ft • H2O level after 15 mins = 8 ft
Premier Geotech and Testing • 2022
Made with FlippingBook - Online catalogs