CFI's Driven Pile Academy: Hosted by the PDCA

WHERE ARE THE PROBLEMS? • Owner wants to use 60 ft long, 18- inch square concrete piles • Drilled on August 22 • Initial Water Level = 8.0 ft • H2O level after 15 mins = 8 ft

Premier Geotech and Testing • 2022

Made with FlippingBook - Online catalogs