CFI's Driven Pile Academy: Hosted by the PDCA

WHERE ARE THE PROBLEMS? • Owner wants to use 30 ft deep, 24- inch diameter drilled shafts • Drilled on October 2 • Initial Water Level = 6.0 ft • H2O level after 15 mins = 5 ft

Premier Geotech and Testing • 2022

Made with FlippingBook - Online catalogs