CFI's Driven Pile Academy: Hosted by the PDCA

Rough Savings Comparison

Existing structures averaged 118 piles per pier and a total of 130,000 lineal feet of pile for each structure If based only on EOID and ΙΈ =0.8 170,000 lineal feet of piling required Final design ~ 64,000 lineal feet used 20 Miles of Piling Saved!